Cutting stock optimisation is the use of mathematical models to decide how standard stock, such as bars, tubes, coils or sheets, is cut into the sizes customers order, so that every order is filled with the least material. Hand-made and rule-based plans leave waste because the number of possible cutting combinations is far too large to evaluate by hand. Optimisation searches those combinations systematically, within real shop-floor constraints.

For a manufacturer whose largest cost is raw material, the difference between a good plan and an average one goes straight to the margin. This guide explains the problem, what the published evidence shows, and how to prove the saving on your own data before anything changes on the shop floor.

What is the cutting stock problem?

The cutting stock problem is the task of filling a set of orders for pieces of given sizes from stock of given sizes, at minimum cost or with minimum waste. Every manufacturer that buys material in standard sizes and sells it in custom sizes faces it.

The problem was formalised in 1961 by P. C. Gilmore and R. E. Gomory at IBM. Their paper in Operations Research defined it as filling an order at minimum cost for specified numbers of lengths of material to be cut from given stock lengths. They also identified the central difficulty: written as a straightforward integer programme, the number of variables generally makes computation infeasible. Their solution, now known as column generation, builds up only the cutting patterns that improve the plan rather than listing every possible one. A cutting pattern is simply one way of cutting a single piece of stock, for example three pieces of 2.1 metres and one of 1.4 metres from a 7.8-metre bar.

The field has grown since. Haessler and Sweeney’s invited review in the European Journal of Operational Research describes linear programming, sequential heuristic and hybrid solution procedures for one- and two-dimensional problems. Wäscher, Haußner and Schumann later published a standard typology of cutting and packing problems in the same journal, which researchers still use to classify them. The point for a manufacturing leader is that this is not an experimental technique. It is a mature branch of operations research with decades of method behind it.

What is the difference between bar cutting (1D) and sheet nesting (2D)?

One-dimensional cutting deals with length; two-dimensional nesting deals with shape. The objective is the same, but the difficulty and the tools differ.

  • 1D cutting covers steel bar, rebar, tube, aluminium and steel profiles, cable, and coils slit into narrower widths. Each order is a length (or width) and a quantity. The question is which lengths to combine on each bar or coil.
  • 2D nesting covers parts cut from sheet or plate by laser, plasma, waterjet or saw. Each part has a shape, and the question is how to arrange parts on a sheet so they fit closely without overlapping. Rectangular parts are easier; irregular shapes are much harder, because the geometry itself must be computed. Bennell and Oliveira’s tutorial on the geometry of nesting problems sets out the methods used.

Many fabricators face both. A structural steel business may saw beams and angles to length and cut plates and brackets from sheet. The two problems are usually optimised separately, but they share the same data: open orders, stock on hand and remnants.

Why do manual and rule-of-thumb cutting plans leave waste?

They leave waste because a person, or a simple rule, can only consider a tiny fraction of the possible combinations. Experienced planners are good at finding plans that work. They are rarely in a position to find the plan that wastes least across the whole order book.

Consider a bar with ten different order lengths that could go on it. The number of feasible patterns runs into the hundreds or thousands, and a full order book needs a combination of patterns, not one. Planners naturally fall back on familiar patterns, or plan order by order, filling each bar as it comes. Simple software rules do something similar. A common rule, “first fit decreasing”, places the longest remaining piece on the first bar that has room. It is fast and sensible, but it does not look ahead. In a 1990 study of aluminium window frames, Stadtler reports that results from a first fit decreasing heuristic were regarded as unsatisfactory, and replaced it with a method based on Gilmore and Gomory’s column generation.

The waste this produces is steady and invisible. No single plan looks wrong. The offcuts are spread across thousands of bars and sheets, and they are often recorded only as scrap sold by weight, at a fraction of the purchase price.

How much of a metal manufacturer’s cost is material?

Material is the largest single cost for most metals and fabrication businesses. US Bureau of Labor Statistics productivity data put the materials share of the value of production at 42.2% for fabricated metal products and 53.1% for primary metal products in 2024.

Two cautions apply. First, BLS defines the factor share as the ratio of the cost of that factor to the total value of production, and “materials” covers all intermediate materials, not only the metal being cut. Second, the share moves with metal prices: for fabricated metals it was 38.4% in 2020 and 45.1% in 2021, according to the same BLS series. Your own share will differ by product mix, but in most metal businesses it is large enough that a few percentage points of waste matter more than most overhead savings.

The arithmetic is simple. Suppose, for illustration only, a business buys £10M of steel a year and 10% of it ends up as unusable offcut. That is £1M of material bought and not sold as product, less whatever scrap merchants pay for it. A 35% reduction in that waste would release £350,000 a year before scrap credit, and the figure grows with volume and with metal prices. Replace the illustrative inputs with your own purchase ledger and scrap records to get your number.

What improvements are documented in research and case studies?

Documented improvements are real but vary widely, because they depend on the starting point, the product mix and what the study counts as waste. Peer-reviewed studies are the strongest evidence; vendor case studies are useful but selected successes.

  • Rebar, multiple stock lengths (peer-reviewed). A 2025 study of rebar cutting for a wastewater treatment plant in Thailand used integer programming and found that, for one bar size, combining 10-metre and 12-metre stock reduced scrap from 17.09% to 1.95%, with material cost savings of up to 15.44% compared with 12-metre stock alone.
  • Steel bars with remnant reuse (peer-reviewed conference paper). Morillo-Torres and colleagues built a mixed-integer model for a metallurgical company cutting steel bars, including inventory limits and reuse of leftovers. They report an average improvement in waste reduction of 80%. The abstract does not state the baseline waste rate, so the figure is best read as relative.
  • Cable reels (vendor-reported). LINDO Systems reports that Anixter, a cable distributor, normally expected about 7% to 8% waste on large cable projects, and cut it to 3% with an optimisation application.
  • Sheet nesting (vendor-reported). Hexagon reports that Norlec, a UK sheet metal subcontractor, raised sheet utilisation from 60–70% to over 80% by nesting parts from different customers’ jobs on the same sheet.

The pattern across these cases is consistent. The largest gains come where the old method was simplest, where several stock sizes or remnants were available but not used systematically, and where orders could be combined across customers or jobs.

What does optimisation do differently?

Optimisation plans the whole order book at once, against the stock actually available, and chooses the combination of patterns that uses least material while respecting every constraint. A planner or a simple rule plans one bar or one order at a time.

The difference shows up in three places. It mixes orders that a planner would not think to combine. It uses the full range of stock lengths and remnants rather than the most familiar one, which is the effect the rebar study measured. And it trades off waste against other costs explicitly, for example accepting a slightly worse yield to avoid an extra machine set-up, when the set-up costs more than the material.

Our work for a metals manufacturer illustrates this. The company bought steel in standard stock lengths and cut it to customer sizes, with plans drawn up by hand by experienced planners. We built an optimisation model around its real constraints and fitted it into the existing planning process: planners load the open order book, the model proposes the cutting plan, and planners review and release it as before. The optimised plans cut material waste by 35%, with every order still filled to specification.

The table below compares the three broad approaches.

Approach Typical waste Planning effort Flexibility
Manual planning Highest; depends on planner experience and time available High; hours per plan, grows with order book size High for exceptions; low for exploring alternatives
Rule-based software (e.g. longest piece first) Lower than manual on simple mixes; no look-ahead across orders Low; plans are produced in seconds Limited; rules are hard to adapt to new constraints
Optimisation model Lowest for the constraints given; plans the whole book at once Low once set up; planners review rather than build High; constraints and costs can be changed and the plan re-run

Which practical constraints does a cutting model need to respect?

A cutting plan is only useful if the shop floor can run it. A plan that is mathematically good but ignores how the machines and the business actually work will not be released, and its saving will never be realised.

  • Blade kerf. Kerf is the width of material removed by each cut. It must be added to every piece, or the plan will be short on every bar.
  • Tolerances and trim. Ends may need squaring, and pieces may have plus-or-minus tolerances that the model can use.
  • Remnant policy. Which offcuts are long enough to keep, where they are stored, and how quickly they must be used. The usable-leftovers literature, reviewed by Cherri and colleagues, treats this as a distinct version of the problem, because keeping too many remnants creates its own cost.
  • Order priorities and due dates. Urgent orders cannot wait for a better combination next week.
  • Machine limits. Maximum and minimum lengths, sheet sizes, saw or laser capacity, and the cost of changing a set-up.
  • Material rules. Grade, heat number traceability, grain direction on sheet, and customer-specific restrictions.

In our steel project the model included the stock lengths held, machine tolerances and blade losses, order priorities and delivery dates. The constraints are what make the result trustworthy to the planners who must release it.

How do you prove cutting savings before changing the shop floor?

Run the model on past order books and compare its plans with the plans actually used, for the same orders and the same stock. The difference in kilograms and in money is the saving, measured on your data before anyone changes how they work.

This is a backtest: testing a model on historical cases and comparing its answer with what actually happened. It is the method set out in our guide to running a risk-free AI pilot, and it suits cutting particularly well, because the past order book, stock records and scrap weights already exist. For the metals manufacturer, that comparison showed how much material each approach consumed for the same orders before a single plan was released to the floor.

How to measure it

Before committing to a cutting optimisation project, an operations or finance director should be able to answer the following from company records.

  1. How much material, by weight and value, did you buy last year, by grade and stock size?
  2. How much left the site as scrap, and at what price per tonne?
  3. How many remnants are held in stock, and how old are they?
  4. Are past cutting plans or production records kept, with the orders they filled?
  5. Which constraints do planners apply that are not written down?
  6. What is the kerf and end trim on each machine?
  7. Can a proposed plan be checked against the actual plan for the same week of orders?
  8. What saving, measured how, would justify changing the planning process?

If the first four answers are available, a backtest can be run quickly. The yield figure that matters is material in finished product divided by material issued, measured over the same period before and after.

Cutting is one of several planning problems of this kind. Load planning, production scheduling and inventory decisions share the same structure, and our manufacturing and supply chain practice applies the same method to each.

If you want to see what this would mean on your own numbers, our diagnostic shows it within seven days.

Sources

Frequently asked questions

What is the cutting stock problem?

It is the problem of cutting customer orders from standard stock, such as bars, tubes, coils or sheets, using the least material or at the lowest cost. It was formalised by Gilmore and Gomory at IBM in 1961 and is one of the best-studied problems in operations research.

What is the difference between 1D cutting and 2D nesting?

One-dimensional cutting deals with lengths: bars, profiles, tubes, cable or coil slit into widths. Two-dimensional nesting deals with shapes cut from sheet or plate, where parts must be arranged on a surface. The goal is the same, less material per order, but 2D problems are geometrically harder.

How much material does cutting optimisation save?

It depends on the starting point. Published cases range from modest gains to large ones: a peer-reviewed rebar study cut scrap on one bar size from 17.09% to 1.95% by combining two stock lengths, and our own work for a metals manufacturer cut material waste by 35%. The only reliable figure is one measured on your own order book.

How large a share of cost is material in metal fabrication?

US Bureau of Labor Statistics data put materials at 42.2% of the value of production for fabricated metal products and 53.1% for primary metal products in 2024. The materials figure covers all intermediate materials, not only metal, but it shows why waste goes straight to margin.

How can you prove cutting savings before changing the shop floor?

Run the optimisation on past order books and compare its plans with the plans actually used, for the same orders and the same stock. Measure the difference in kilograms of material and in money. If the saving holds across several periods, it is real.

Does cutting optimisation replace production planners?

It should not. The model proposes a plan within the constraints the planners set, and planners review, adjust and release it. Their knowledge of machines, customers and exceptions is what makes the plan workable.